FAQs
More FAQs- How long will it take to have my hard floors coated with urethane?
- Does acrylic have an odour during application?
- Are there instructions to follow after my carpets are cleaned?
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. The coating application can be accomplished at a rate of 750 square feet per hour with a two-person crew.
Acrylic does have an odour during application, but it is generally mild and usually dissipates within a short period of time.
Immediately after cleaning, it’s best to allow carpets to dry for 6-8 hours before walking on them. Walking on them may flatten the fibers. Use air movers if needed to help air circulation as this will speed up the drying time. If a carpet protector such as ScotchgardTM was applied, foot traffic should be minimized for up to 24 hours to let the product cure. Don’t move any furniture back in place until carpet is completely dry or the Scotchgard carpet protector has cured.